| Mfr. #: | BQ27441EVM-G1B |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | Power Management IC Development Tools BQ27441EVM-G1B |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | BQ27441EVM-G1B Ficha de datos |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. Texas Instruments is a trusted brand for quality electronics Interface Type: I2C Compatible with BQ27441-G1B. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.250213 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ27441EVM-G1B Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Battery Management.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: Is the cutoff frequency of the product Interface Type?
Q: Yes, the product's Interface Type is indeed I2C
A: Is the cutoff frequency of the product For Use With?
Q: Yes, the product's For Use With is indeed BQ27441-G1B
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Power Management IC Development Tools
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools
A: At what frequency does the Unit Weight?
Q: The product Unit Weight is 0.250213 oz.