| Mfr. #: | BQ25970EVM-893 |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | Power Management IC Development Tools BQ25970EVM-893 |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | BQ25970EVM-893 Ficha de datos |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 12 V Input Voltage Output Voltage is 3 V to 6 V Output current: 8 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ25970EVM-893 Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Battery Management
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 12 V.
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 3 V to 6 V.
A: What is the Output Current of the product?
Q: The Output Current of the product is 8 A.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 85 C.
A: At what frequency does the Minimum Operating Temperature?
Q: The product Minimum Operating Temperature is - 40 C.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools