BQ25570EVM-206

Mfr. #: BQ25570EVM-206
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools BQ25570 EVAL MOD
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: BQ25570EVM-206 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ25570EVM-206 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Energy Harvesting type. 0.13 V to 4 V Input Voltage Output Voltage is 1.8 V Output current: 100 mA Texas Instruments is a trusted brand for quality electronics Compatible with BQ25570. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.128895 oz of Unit Weight

BQ25570EVM-206 Image

BQ25570EVM-206

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ25570EVM-206 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Energy Harvesting
  • Tool Is For Evaluation Of: BQ25570
  • Input Voltage: 0.13 V to 4 V
  • Output Voltage: 1.8 V
  • Description/Function: Battery charger evaluation module for energy harvesting
  • Output Current: 100 mA
  • Series: BQ25570
  • Brand: Texas Instruments
  • For Use With: BQ25570
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.128895 oz

BQ25570EVM-206

BQ25570EVM-206 Specifications

BQ25570EVM-206 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Energy Harvesting.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 0.13 V to 4 V

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 1.8 V

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 100 mA.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is BQ25570.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.128895 oz.

15 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top