BQ2019EVM-001

Mfr. #: BQ2019EVM-001
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools BQ2019 Eval Kit for 2.8-5V Multi-Chem
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: BQ2019EVM-001 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ2019EVM-001 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Battery Management type. 2.8 V to 4.2 V Input Voltage Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ2019EVM-001 Image

BQ2019EVM-001

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ2019EVM-001 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ2019
  • Input Voltage: 2.8 V to 4.2 V
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ2019EVM-001

BQ2019EVM-001 Specifications

BQ2019EVM-001 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Battery Management.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 2.8 V to 4.2 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top