AMC1305M25EVM

Mfr. #: AMC1305M25EVM
Fabricante: Texas Instruments
Descripción: Data Conversion IC Development Tools AMC1305M25EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: AMC1305M25EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AMC1305M25EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. Texas Instruments is a trusted brand for quality electronics Compatible with AMC1305. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

AMC1305M25EVM Image

AMC1305M25EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AMC1305M25EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: AMC1305M25
  • Description/Function: Isolated Single-Channel Delta-Sigma Modulator
  • Series: AMC1305M05
  • Brand: Texas Instruments
  • For Use With: AMC1305
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

AMC1305M25EVM

AMC1305M25EVM Specifications

AMC1305M25EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is AMC1305.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top