AMC1305L25EVM

Mfr. #: AMC1305L25EVM
Fabricante: Texas Instruments
Descripción: Data Conversion IC Development Tools AMC1305L25EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: AMC1305L25EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AMC1305L25EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 3 V to 5.5 V operating supply voltage range Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: LVDS Compatible with AMC1305. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

AMC1305L25EVM Image

AMC1305L25EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AMC1305L25EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: AMC1305
  • Operating Supply Voltage: 3 V to 5.5 V
  • Packaging: Bulk
  • Description/Function: Isolated single-channel Delta-Sigma modulator evaluation module
  • Series: AMC1305L25
  • Brand: Texas Instruments
  • Interface Type: LVDS
  • For Use With: AMC1305
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

AMC1305L25EVM

AMC1305L25EVM Specifications

AMC1305L25EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3 V to 5.5 V.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is LVDS.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is AMC1305.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top