AMC1304M05EVM

Mfr. #: AMC1304M05EVM
Fabricante: Texas Instruments
Descripción: Data Conversion IC Development Tools AMC1304M05EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: AMC1304M05EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AMC1304M05EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Data Acquisitions type. Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: CMOS Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

AMC1304M05EVM Image

AMC1304M05EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AMC1304M05EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Data Acquisitions
  • Tool Is For Evaluation Of: AMC1304M05
  • Packaging: Bulk
  • Description/Function: Reinforced isolated modulator evaluation module
  • Series: AMC1304M05
  • Brand: Texas Instruments
  • Interface Type: CMOS
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

AMC1304M05EVM

AMC1304M05EVM Specifications

AMC1304M05EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Data Acquisitions.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed CMOS

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top