AFE4404EVM

Mfr. #: AFE4404EVM
Fabricante: Texas Instruments
Descripción: Multiple Function Sensor Development Tools AFE4404 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: AFE4404EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE4404EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Multiple Function Sensor Development Tools product type 1 of 100 Development Tools as subcategory 1. 7.622703 oz of Unit Weight

AFE4404EVM Image

AFE4404EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE4404EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Multiple Function Sensor Development Tools
  • RoHS: N/A
  • Series: AFE4404
  • Brand: Texas Instruments
  • Product Type: Multiple Function Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 7.622703 oz

AFE4404EVM

AFE4404EVM Specifications

AFE4404EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Multiple Function Sensor Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 7.622703 oz

14 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top