| Mfr. #: | ADS6445EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | Data Conversion IC Development Tools ADS6445EVM |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | ADS6445EVM Ficha de datos |


This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the ADC type. 3.3 V to 5 V operating supply voltage range Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: SMA Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS6445EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is ADC.
A: What is the Operating Supply Voltage of the product?
Q: The Operating Supply Voltage of the product is 3.3 V to 5 V.
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: What is the Interface Type of the product?
Q: The Interface Type of the product is SMA.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.