ADS54RF63EVM

Mfr. #: ADS54RF63EVM
Fabricante: Texas Instruments
Descripción: Data Conversion IC Development Tools ADS54RF63 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADS54RF63EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS54RF63EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the ADC type. 3.3 V to 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SMA Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS54RF63EVM Image

ADS54RF63EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS54RF63EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: ADC
  • Tool Is For Evaluation Of: ADS5463
  • Operating Supply Voltage: 3.3 V to 5 V
  • Series: ADS54RF63
  • Brand: Texas Instruments
  • Interface Type: SMA
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS54RF63EVM

ADS54RF63EVM Specifications

ADS54RF63EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3.3 V to 5 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed SMA

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top