ADS54J66EVM

Mfr. #: ADS54J66EVM
Fabricante: Texas Instruments
Descripción: Data Conversion IC Development Tools ADS54J66EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADS54J66EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS54J66EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: JESD204B, USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS54J66EVM Image

ADS54J66EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS54J66EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • Shipping Restrictions:
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADS58J63, ADS54J66
  • Operating Supply Voltage: 5 V
  • Description/Function: ADS58J63, ADS54J66 high speed, JESD204B interface ADCs
  • Series: ADS54J66
  • Brand: Texas Instruments
  • Interface Type: JESD204B, USB
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS54J66EVM

ADS54J66EVM Specifications

ADS54J66EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is JESD204B, USB.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top