| Mfr. #: | ADS5295EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | Data Conversion IC Development Tools ADS5295 EVAL MOD |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | ADS5295EVM Ficha de datos |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 1.65 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with ADS5295. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.083205 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5295EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: What is the Type of the product?
Q: The Type of the product is ADC.
A: Is the cutoff frequency of the product Operating Supply Voltage?
Q: Yes, the product's Operating Supply Voltage is indeed 1.65 V
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: At what frequency does the Interface Type?
Q: The product Interface Type is USB.
A: At what frequency does the For Use With?
Q: The product For Use With is ADS5295.
A: What is the Product Type of the product?
Q: The Product Type of the product is Data Conversion IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 0.083205 oz