ADS42JB69EVM

Mfr. #: ADS42JB69EVM
Fabricante: Texas Instruments
Descripción: Data Conversion IC Development Tools ADS42JB69EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADS42JB69EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS42JB69EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Compatible with ADS42JB69. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS42JB69EVM Image

ADS42JB69EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS42JB69EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADS42JB69
  • Operating Supply Voltage: 5 V
  • Series: ADS42JB69
  • Brand: Texas Instruments
  • For Use With: ADS42JB69
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS42JB69EVM

ADS42JB69EVM Specifications

ADS42JB69EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is ADS42JB69.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top