ADS4225EVM

Mfr. #: ADS4225EVM
Fabricante: Texas Instruments
Descripción: Data Conversion IC Development Tools ADS4225 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADS4225EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS4225EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the ADC type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: Serial Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS4225EVM Image

ADS4225EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS4225EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • Type: ADC
  • Tool Is For Evaluation Of: ADS4225
  • Operating Supply Voltage: 5 V
  • Series: ADS4225
  • Brand: Texas Instruments
  • Interface Type: Serial
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS4225EVM

ADS4225EVM Specifications

ADS4225EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is Serial.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top