ADS41B29EVM

Mfr. #: ADS41B29EVM
Fabricante: Texas Instruments
Descripción: Data Conversion IC Development Tools ADS41B29 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADS41B29EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS41B29EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS41B29EVM Image

ADS41B29EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS41B29EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: E
  • Series: ADS41B29
  • Brand: Texas Instruments
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS41B29EVM

ADS41B29EVM Specifications

ADS41B29EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top