ADS4126EVM

Mfr. #: ADS4126EVM
Fabricante: Texas Instruments
Descripción: Data Conversion IC Development Tools ADS4126EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADS4126EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS4126EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS4126EVM Image

ADS4126EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS4126EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Series: ADS4126
  • Brand: Texas Instruments
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS4126EVM

ADS4126EVM Specifications

ADS4126EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top