ADS1606EVM

Mfr. #: ADS1606EVM
Fabricante: Texas Instruments
Descripción: Data Conversion IC Development Tools ADS1606 Evaluation Module
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADS1606EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS1606EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the ADC type. 8 V to 40 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS1606EVM Image

ADS1606EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS1606EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • Shipping Restrictions:
  • RoHS: N
  • Product: Evaluation Boards
  • Type: ADC
  • Tool Is For Evaluation Of: ADS1606
  • Operating Supply Voltage: 8 V to 40 V
  • Brand: Texas Instruments
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS1606EVM

ADS1606EVM Specifications

ADS1606EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 8 V to 40 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top