ADC31JB68EVM

Mfr. #: ADC31JB68EVM
Fabricante: Texas Instruments
Descripción: Data Conversion IC Development Tools ADC31JB68EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: ADC31JB68EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC31JB68EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 5 V operating supply voltage range Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: JESD204B Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADC31JB68EVM Image

ADC31JB68EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC31JB68EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • Shipping Restrictions:
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADC31JB68
  • Operating Supply Voltage: 5 V
  • Packaging: Bulk
  • Description/Function: Evaluate the ADC31JB68 analog to digital converter
  • Series: ADC31JB68
  • Brand: Texas Instruments
  • Interface Type: JESD204B
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADC31JB68EVM

ADC31JB68EVM Specifications

ADC31JB68EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5 V.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed JESD204B

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top